docs: make technical prose concrete

This commit is contained in:
Turtle
2026-08-09 15:27:21 +08:00
parent 673e7cddc5
commit a27efdef36
459 changed files with 1342 additions and 1329 deletions
+2 -2
View File
@@ -1,7 +1,7 @@
// Web e2e scenario: assistant IconActions belong to the settled answer, so
// they arrive with `turn/end` and not before. The recorded turn narrates in
// plain text before its tool call, which is the shape that would hand the
// footer to mid-turn narration for the seconds a tool runs and then move it
// plain text before its tool call, which is the event order that would show the
// footer beside mid-turn narration for the seconds a tool runs and then move it
// down. A `hang` sidecar on the SECOND model call parks the turn after the
// narration and the tool result are durable, so the running state is stable by
// construction rather than by timing; stopping from that park writes the