Two pairs needed their confirmed-consistent state refreshed: the
intent-named note's supersession clause (zh link normalized to the shared
`.md` target, since the pairing contract requires identical link targets)
and the report README's acceptance-semantics rewrite (both sides edited).
Re-record both pairs so the translation-pairing gate passes.
The 2026-07-27 intent-named operations note still declared that a
continuable provider requires `flush()` to resolve `true` at its final
result boundary and maps `false`/rejection to `DURABILITY_FAILED`. The
activation-based record (2026-07-28-continuable-subagent-conversations)
superseded that contract: the manager awaits the final flush as a
best-effort barrier and deliberately ignores the boolean, because listener
participation cannot identify a persistence backend.
Active notes are the current source of truth — sync both sides of the
bilingual pair by marking the old clause superseded with a link to the
record that replaced it.
Moves the RFC to implemented/, restates it as current-state prose under the
implemented note format, and records what the Task-backed continuable-subagents
note and the two subagent-service simplification notes retain versus what this
record replaces.