Agent Note: Evidence-based larger hosted runners
Status: implemented
English | 中文
Problem
The shard-heavy CI topology met its latency targets by spreading primary Node work across 40 Linux jobs and Windows work across nine jobs. Most gates were shorter than checkout, runner setup, cache restore, and dependency installation, so repeated setup waves created both cost and latency variance. One hosted run finished its slowest Linux job in 49 seconds yet took 231 seconds for a Windows lint shard whose checkout, cache restore, and install alone consumed 158 seconds.
Larger runners make it possible to pay setup once and parallelize inside the repository scheduler, but the useful size cannot be selected from core counts alone. Critical-lane benchmarks did not scale monotonically, and a whole-repository aggregate exposed different bottlenecks from isolated typecheck or site builds.
Decision
The organization keeps twelve x64 larger-runner pools in the repo-restricted dsh-larger-ci group: Ubuntu 24.04 and Windows 2025 at 4, 8, 16, 32, 64, and 96 cores. Public IPs are disabled. Each pool has an autoscaling ceiling of 256; the ceiling does not allocate idle machines or remove the need to bound workflow demand.
Production CI assigns each of the six Linux pool sizes exactly once, assigns one 32-core Windows pool, and keeps only the final aggregator on a standard runner. The version and language jobs are environment contracts rather than slices of one gate inventory; the primary Node work has three coarse lanes instead of a gate-level shard matrix:
node 24 / coreuses the 96-core Linux pool. One checkout, setup, cache restore, and install feeds 36 unsharded static, lint, documentation, hygiene, build, and artifact gates.run-gatesstarts up to 32 independent gates and ESLint uses 32 workers. Build starts eagerly; its artifact consumers still wait for emitted output.node 24 / cpuuses the 64-core Linux pool for six CPU- or dependency-critical gates: typecheck, coverage, build followed by snapshot replay, and two Node 24 compatibility smokes. Coverage uses at most 12 workers and snapshot uses at most 16. This lane builds separately so snapshot replay consumes same-lane output. Coverage stays at 12 forks because 32 forks crashed Node 24's CJS lexer twice and a later 16-fork run reproduced the same worker loss and invalid coverage.node 24 / production siteuses the 16-core Linux pool for the longest independent primary gate. This is one coarse split, not a shard matrix: the job performs one setup and one production VitePress build.- Node 22.19 compatibility, Python 3.10, and Node 26 compatibility use the 4-, 8-, and 32-core Linux pools respectively. Distinct labels avoid both standard-runner setup outliers and the delayed second allocation observed when two jobs shared one pool.
windows node 24 / completeuses the 32-core Windows pool. One setup feeds the required package build, the required production site build, and the complete observational portability inventory. The outer scheduler has 32 slots. Required failures fail the job; observational failures are printed as non-blocking and preserve their former advisory status. ESLint itself stays single-threaded because 16 ESLint worker threads increased full-lint time to 174.54 seconds; outer gate concurrency uses the runner without multiplying Windows worker startup and TypeScript project loading.
The Windows shape followed two cold-path observations. A first candidate used two 16-core Windows jobs, and GitHub took 93 seconds to provision the second same-label runner despite the configured autoscaling ceiling. A later documentation-head validation took 266 seconds on a separate Windows blocking job after spending 138 seconds restoring a 153 MB pnpm cache. Combining all Windows work on one 32-core box removed the duplicate setup wave.
Two later runs set the Linux boundaries. A standard-runner validation took 67 seconds for Node 26 even though repository work took five seconds, because GitHub spent 36 seconds in Set up job. Moving the environment contracts to distinct larger pools removed that lottery. The next all-larger-runner validation took 68 seconds on the 96-core primary job: repository work remained 26 seconds, but setup, cache, install, and finalization consumed 42 seconds. Moving typecheck, coverage, and the build-to-snapshot dependency chain to one coarse 64-core lane reduced the 96-core lane's repository critical path to 14.81 seconds without returning to per-gate shards.
A documentation-head repeat showed that 16 coverage forks still admitted the CJS-lexer crash. The coverage process completed its remaining tests in 23.73 seconds, but the dead worker left one file below threshold and correctly failed the lane. Twelve forks completed the same gate in 26.06 seconds in the final run, keeping the CPU lane below one minute while restoring process headroom.
The workflow retains four manual diagnostics. suite=larger-runner-benchmark compares isolated critical lanes across every size, suite=consolidated-runner-benchmark compares whole aggregates, suite=sharded-reference preserves the former production shard topology, and suite=serial-reference remains the unsharded cross-platform completeness oracle. suite=optimized-larger-runners runs the exact production topology against a branch ref when a pull request cannot form a merge commit.
The first twelve-size critical-lane benchmark used a workflow-only commit on top of the standard-runner baseline, so the code, lockfile, and commands were identical:
| Critical job | Standard | 4 cores | 8 cores | 16 cores | 32 cores | 64 cores | 96 cores |
|---|---|---|---|---|---|---|---|
| Linux typecheck | 56 s | 38 s | 35 s | 40 s | 35 s | 44 s | 40 s |
| Windows production site | 160 s | 117 s | 103 s | 113 s | 75 s | 105 s | 108 s |
Those isolated results showed that setup dominated but did not identify the production size. A whole-aggregate benchmark without native ESLint concurrency found a 69-second single-threaded Linux lint gate. After enabling native Linux ESLint concurrency, the second whole-aggregate benchmark produced these active job times:
| Job | 4 cores | 8 cores | 16 cores | 32 cores | 64 cores | 96 cores |
|---|---|---|---|---|---|---|
| Linux complete primary | 147 s | 104 s | 95 s | failed at 57 s | 66 s | 60 s |
| Windows blocking builds | 137 s | 127 s | 113 s | 107 s | 105 s | 131 s |
The Linux 32-core failure was the first CJS-lexer worker crash. The 96-core aggregate was the only successful all-size result at the one-minute boundary. Although Windows repository work gained little above 16 cores, the 32-core pool can start the complete outer inventory together and, more importantly, removes an entire paid setup from production.
The exact all-pool validation run passed every job at the tested branch head:
| Production job (pool) | Active time | Repository work | Result |
|---|---|---|---|
| Node 22.19 compatibility (Linux 4) | 30 s | compatibility smokes | passed |
| Python 3.10 (Linux 8) | 31 s | complete keyless SDK suite | passed |
| Production site (Linux 16) | 51 s | VitePress in 24.23 s | passed |
| Node 26 compatibility (Linux 32) | 27 s | compatibility smokes | passed |
| Primary CPU (Linux 64) | 56 s | 6 gates in 26.07 s | passed |
| Primary core (Linux 96) | 49 s | 36 gates in 15.58 s | passed |
| Windows complete (Windows 32) | 102 s | 37 gates in 29.98 s | passed |
All seven paid jobs began within one second. The slowest non-Windows job finished in 56 seconds. The Windows job spent 21 seconds restoring its pnpm cache and 14 seconds installing dependencies, so its 102-second active time measures hosted setup variance as well as repository work. Every non-Windows job stays below one minute and the sole Windows job stays below three minutes.
Alternatives considered
Keep the former shard topology in production. The shards can be fast when provisioned together, but 49 larger-runner jobs repeat setup and create more chances for a cold outlier. The 231-second Windows control demonstrated that a short lint shard does not protect the end-to-end job target.
Select a production size from the critical-lane benchmark. Four cores looked cost-effective for isolated typecheck and site builds, but the full aggregate found repository-wide lint and dependent artifact work that those commands did not represent.
Run the production site inside the Linux core aggregate. This reached 50 seconds with warm hosted setup, then crossed the threshold at 64 seconds when the site gate took 29.05 seconds. One coarse independent site job protects the target without returning to gate-level sharding.
Keep every primary gate on the 96-core Linux runner. Repository work completed in 26 seconds, but a 42-second cold path still pushed the job to 68 seconds. The 64-core CPU lane owns the three longest independent or dependency-critical paths; the remaining 36-gate core inventory completes its repository work in 14.81 seconds.
Keep required and observational Windows checks in separate jobs. The split preserved status semantics at the workflow level but paid setup twice, and a cold cache pushed the required job to 266 seconds. run-gates now preserves those semantics inside one process: build and production site are required, while the remaining inventory is explicitly non-blocking.
Prebuild before starting the Linux aggregate. This moved build onto the setup path and produced a 66-second candidate. Starting build eagerly inside run-gates preserves artifact dependencies while overlapping it with unrelated checks.
Use native ESLint worker concurrency on Windows. Sixteen workers made lint more than five times slower than the final single-threaded result. Outer gate parallelism uses the 32-core runner without multiplying ESLint's Windows worker startup and TypeScript project loading.
Keep compatibility and Python on standard runners. Warm runs completed in 43 seconds or less, but one Node 26 job later spent 36 seconds in GitHub setup and crossed the target despite only five seconds of repository work. Distinct larger pools stabilize those environment contracts; the three-second final aggregator remains on a standard runner because it begins only after the paid jobs release capacity.
Consequences
The all-pool validation consumed one billed minute at each Linux size and two billed 32-core Windows minutes. At the configured larger-runner rates, its larger-runner cost was $0.896. The all-size critical benchmark cost $2.936. GitHub rounds each larger-runner job up to a whole minute, so reducing paid job count from 49 to seven matters as much as shortening repository work.
The existing zero-dollar Actions budget did not block larger-runner jobs. The repo-only runner group, bounded workflow topology, manual benchmark triggers, and job timeouts are the observed cost controls; the budget is not treated as an execution guard.
Production CI depends on the organization-owned runner names in this note and in .github/workflows/ci.yml. Missing or renamed pools leave jobs queued instead of falling back to standard capacity. Manual all-size, consolidated, former-shard, and serial suites remain available so image, dependency, scheduler, or pricing changes can be remeasured before changing production labels.