1caca08301
cancel-in-progress is evaluated against the newly triggered run, so exempting push means one master merge does not cancel the drill still running from the previous one — not that a drill always finishes. A benchmark dispatched on master shares the group and does cancel a mid-flight drill. Record that bound in the runbook and drop the overstated wording from the workflow comment and the spec name. Also repair two gates that fail on master and block every pull request: the telemetry note referenced an SDK proposal deleted in 408721954a, and the ui-settings-general README pair carried stale recorded hashes after both sides were updated together in aa1ec02bc6.
7 lines
521 B
YAML
7 lines
521 B
YAML
# Bilingual-pair consistency record (docs/i18n/README.md): the git blob hash of each
|
|
# side as of the last confirmed-consistent state. Both languages carry equal authority;
|
|
# after editing either side, bring the other along and re-record with:
|
|
# pnpm run verify-translation-pairing --write .agents/notes/implemented/feature/2026-08-10-telemetry-default-off.md
|
|
2026-08-10-telemetry-default-off.md: 3b9cd4bc3e9c98ee96ae036a0e981aa585a02403
|
|
2026-08-10-telemetry-default-off.zh.md: 18f83869243b3d5c65278e654f4ac10e9bfe7d30
|